Automation Portals
- Automatic Identification
- Design & Simulation
- Digital Factory
- Electrical & Control Panels
- Embedded Automation
- Factory Automation
- Fieldbus Networks
- Flow, Level & Process Inst.
- Fluid Power, Valves & Pumps
- HMI & Operator Interfaces
- Industrial Communications
- Industrial Computers
- Industrial I/O
- Machine Control
- Machine Safety
- Manufacturing Intelligence
- Motion Control
- OPC
- Plant Management & Maint.
- PLCopen
- Process Control
- Process Safety
- Programmable Controllers
- Robots & Robot Controllers
- SCADA & RTU
- Security
- Sensors
- Systems Integration
- Test, Measurement & LIMS
- Vision
- Wireless Connectivity
- Network Portals
- EtherCAT
- EtherNet/IP
- PROFINET
- Industry Portals
- Building Automation
- Chemical
- Food & Beverage
- Machine Tools, CNC & DNC
- Material Handling
- Oil & Gas
- Packaging
- Pharmaceutical
- Power & Energy
- Transportation (Microsite)
- Water & Wastewater
- Event Portals
- Hannover Messe
- Industrial Automation NA
- ISA Automation Week
Monitoring Cooling Towers
Over the years there has been no shortage of recommendations for monitoring
cooling towers. If you ask four people you can get as many as half a dozen
suggestions. One thing for sure is you can put too much monitoring on a cooling
tower if you let yourself be talked into it. Few users want to wait for failures
before they fix problems with motors, couplings, drive shafts, gears, bearings
or even blades. Nor do they want to perform maintenance on a time based
schedule. This paper reviews practical approaches to having a dependable
monitoring capability as well as provide signal sources for a periodic
monitoring program.
Scheduling
Maintenance
Scheduling maintenance, based on machinery condition, is being done on major
plant machinery today by many users. Many plants now include balance of plant
(BOP) machinery in such programs. Cooling towers are included, in varying
degrees, in periodic vibration monitoring programs designed to alert the user of
changes in running conditions which might be the start of potential problems.
These can appear as increasing trends in the vibration level or as significant
changes in the vibration "signature".
A vibration monitoring program that includes periodically measuring vibration on the drive motor but not the gear, because it is not accessible, is good but not as complete as it could be. Many users are installing vibration sensors, usually accelerometers, on cooling tower gear assemblies and running the interconnect cable out to an area that is accessible by personnel. The cable is usually terminated in a connection center (or switch box) where it is out of the weather as well as the sometimes harsh environment. These sensors remain unpowered until the data collection instrument is connected to them. Power comes from the data collector. Needless to say, a periodic inspection program can be enhanced by adding measurement points on the gear this way.
Continuous
Monitoring
Continuous monitoring is a good idea for cooling towers because some types of
failures occur suddenly. The most common type of sudden failure is broken blades
(part or whole). Others are usually structurally related. Mechanical drive
system problems can be seen, most of the time, in a periodic monitoring program,
before they become critical.
Most
cooling towers were originally equipped with mechanical switches (commonly
refereed to as "kick" switches or "earthquake" switches).
These are often tied into the motor drive power circuit and will shut down a
cell in a tower if activated, offering protection against catastrophic damage.
Often the vibration switch will not respond when it should for a variety of
reasons. For example, if a switch is mounted on a wooden cross member that has
loosened, it may not respond to a loose coupling bolt even if it causes an
unbalance condition. The vibration switch does not offer any protection in this
case. Recognizing this fault, many users have replaced these devices.
A
continuous monitoring system, the kind used to monitor critical machinery,
offers several advantages for monitoring cooling towers. One advantage is the
sensors can be mounted directly on the bearing support parts on the motor and
the gear so bearing condition, as well as casing vibration can be measured.
Also, two levels of alarm can be set so operators can be made aware of potential
problems at early stages of development before a condition becomes critical. The
second level of alarm can be used for shutdown in the same manner as did the
vibration switch. The problem with conventional continuous monitoring is simply
that it costs too much and is hard to justify.
A Reasonable Cost Solution
A
modular continuous monitoring system, such as the Hardy Instruments DI 5500
Series, offers low cost "building blocks" that are ideally suited to
monitoring cooling towers. The modules include vibration detection modules, dual
set point modules, and relay modules. Other modules are available but these
three types can be combined to provide a very reliable continuous monitoring
capability for cooling towers.

Figure 2, Single Measurement Point on Gear and Motor
A
minimum system, per cell, is illustrated in Figure 2. Two accelerometers are
used, one on the motor inboard bearing and one on the gear near the input shaft
bearing. Both are in the horizontal plane. Two signal conditioners are used ,
one for each sensor, which convert the sensor signal to a velocity vibration,
and provide output drive signals to a single dual set point module on an
"auctioneering" basis. That is, the highest signal is the signal the
set point module responds to. The outputs of the set point module are used to
drive one or two relay modules, depending on whether or not two alarm levels are
needed. The modules are mounted on a din rail inside a stainless steel enclosure
which is installed up near the machinery or down at ground level. A power supply
module is also required which operates on 120 Vac power.
In this
configuration continuous monitoring and protection is provided for both the
drive motor and gear assembly at a minimum level. This is a good system! Here is
where it can get expensive! It is easy to say "lets put on some additional
points"! Additional points are a good idea from a vibration analysts stand
point but they do not necessarily make a better protection system. But lets
review them anyway. Alternate configurations would include a second
accelerometer on the outboard bearing of the motor and a second, or even a
third, accelerometer on the gear. The second accelerometer would be mounted on
the input shaft bearing in the vertical direction and the third accelerometer
would be mounted on the back side of the gear housing in the axial direction, as
illustrated in Figure 3.

Figure
3, Additional Measurement Points Added to Gear and Motor
The
user has the additional benefit of being able to include these points in a
periodic monitoring program where trends are easily observed. These trends
consist of overall vibration, vibration spectrum, HFD and Envelope measurements,
for example. The accelerometer makes HFD and Envelope measurements possible
which offers the user alternate methods of tracking the condition of bearings
and gears. The signal conditioners have a buffered signal output that allows for
easy connection of analysis instruments.
System Expansion
Another
output signal is provided on all Hardy signal conditioners. A 4-20 mA output
signal that is proportional to full scale is standard. This signal can be used
as an input for indicators, chart recorders, a PLC or a DCS system to log and
display vibration levels as well as to trend them. Most of these data logging
instruments can be configured with alarming functions as well.
General Installation Concerns
A
cooling tower is a unique piece of plant equipment and require some special
consideration when installing and planning a monitoring system. First is
grounds. It is important to make sure there is a good electrical ground on both
the drive motor and the gear assembly. Letting the vibration sensor return lines
be the only ground source will get you a noisey monitoring system for sure! You
can imagine what 10 mV of noise will look like on a 4-20 mA loop! Typically we
tie the sensor shields to earth ground but keep the signal conditioner common
isolated from earth ground through the power supply.
The next item where cooling towers are different from most of the other machinery in the plant is the alarm philosophy. Do not use high speed rotating machinery alarm concepts for cooling towers. If you do you will get a lot on nuisance alarms! Cooling towers shake! Set the alarm levels high enough. Numbers like 0.5 ips for alert and 0.8 ips for trip would be unheard of for high speed machinery but they are common on cooling tower gear assemblies. Also, set the alarm delay time long enough. Do not be afraid to set 6 to 8 seconds. You will avoid a lot of false trips and you will not jeopardize the monitoring and protection concept. Think of it this way. If you lost a blade, you would not do significantly more damage in 8 seconds than you would in 3 seconds. The benefit is, when you do get an alarm, you can be confident there is something wrong.
This article is provided by Hardy Instruments, www.hardyinst.com.