• ISA provides technical resources and standards to help industrial automation professionals advance their careers and the field. We enable automation professionals worldwide to solve problems and enhance their skills by bringing people together to create new technologies and share best practices with future automation professionals.
    • Industry Insights

  • We attract over 140,000 unique automation professionals monthly, making us the premier online content provider and the only dedicated electronic magazine in the automation industry.

    Monthly Magazine

    • More things to read

    Back
    Back
  • M logo for Automation.com Monthly. Link to current issue.

ABB to help integrate automation and safety systems for Norwegian oil field development project

By: ABB
01 May, 2018
1 min read
ABB to help integrate automation and safety systems for Norwegian oil field development project
ABB to help integrate automation and safety systems for Norwegian oil field development project
Located in the Barents Sea, north of the Arctic Circle, the field will be developed with an FPSO (Floating Production, Storage and Offloading production vessel) and subsea installation with 30 wells. The field has volumes estimated at between 400 and 600 million barrels of oil.

May 1, 2018 -ABB announced that it will provide integrated ABB Ability automation and safety systems to Statoil’s Johan Castberg oil field development project in Norway. Integrated control, safety and communication will be key to the successful operation of this new field.

Located in the Barents Sea, north of the Arctic Circle, the field will be developed with an FPSO (Floating Production, Storage and Offloading production vessel) and subsea installation with 30 wells. The field has volumes estimated at between 400 and 600 million barrels of oil.

ABB will provide integrated ABB Ability System 800xA automation and safety systems, including simulation and related services to ensure safe operation of the offshore FPSO. The order is valued at around $25 million.

Working closely with design contractor Aker Solutions ABB will provide engineering, installation and commissioning for execution of the project and ensure that production runs from day one of operation.

ABB has experience in gas production and optimization, and a history of collaboration with Statoil on numerous projects around the world.

The field is scheduled to commence operation in 2022 and will have an estimated production lifespan of 30 years. ABB’s deliveries will start in late 2018.

Advertisement

Trending Articles

Advertisement

Related Articles

View all Articles and News
Advertisement
Advertisement