• ISA provides technical resources and standards to help industrial automation professionals advance their careers and the field. We enable automation professionals worldwide to solve problems and enhance their skills by bringing people together to create new technologies and share best practices with future automation professionals.
    • Industry Insights

  • We attract over 140,000 unique automation professionals monthly, making us the premier online content provider and the only dedicated electronic magazine in the automation industry.

    Monthly Magazine

    • More things to read

    Back
    Back
  • M logo for Automation.com Monthly. Link to current issue.

TraceLink introduces Automated Validation Manager (AVM)

14 June, 2017
TraceLink introduces Automated Validation Manager (AVM)
TraceLink introduces Automated Validation Manager (AVM)
Using a browser, TraceLink AVM customers login to a web portal and review any aspect of the validation lifecycle, including the validation plan, traceability matrix, test results and final validation certificates.

June 14, 2017—TraceLink Inc., a Track and Trace Network for connecting the life sciences supply chain and eliminating counterfeit prescription drugs from the global marketplace, announced Automated Validation Manager (AVM) – a web-based offering that automates the validation lifecycle of the TraceLink Life Sciences Cloud on an ongoing basis.

By subscribing to TraceLink AVM, customers no longer have to deploy manual, paper-based validation. Using a browser, TraceLink AVM customers login to a web portal and review any aspect of the validation lifecycle, including the validation plan, traceability matrix, test results and final validation certificates. Once validation is complete, TraceLink AVM customers will know that all required IQ, OQ, and PQ test scripts have been successfully executed in a dedicated validation environment.

TraceLink AVM is designed to remove both the in-house and outsourcing burdens of validation by automating validation testing and confirming that current TraceLink software capabilities perform as intended. The end result is a fully executed, 100% paperless package compliant with GxP compliance standards, such as GAMP 5.

Trending Articles

Advertisement

Related Industry Products

View all Industry Products
Advertisement
Advertisement