• ISA provides technical resources and standards to help industrial automation professionals advance their careers and the field. We enable automation professionals worldwide to solve problems and enhance their skills by bringing people together to create new technologies and share best practices with future automation professionals.
    • Industry Insights

  • We attract over 140,000 unique automation professionals monthly, making us the premier online content provider and the only dedicated electronic magazine in the automation industry.

    Monthly Magazine

    • More things to read

    Back
    Back
  • M logo for Automation.com Monthly. Link to current issue.

What are the Challenges of Process Plant Upgrade Projects?

By: Contributing Authors
01 April, 2015
3 min read
What are the Challenges of Process Plant Upgrade Projects?
What are the Challenges of Process Plant Upgrade Projects?
New process plant construction or upgrade projects launched using in-house resources often end up calling in outside professionals to help.

This post was authored by Tim Green, manager of commissioning services at Endress+Hauser and formerly U.S. operations manager for the field services division at MAVERICK Technologies. This is part one of a two-part series. To read the second part of this series, click this link.

If you aren’t aware of the pitfalls, you might fall into a hole. Here’s how new construction and plant upgrade projects get in trouble.

We’ve all seen jokes about people, primarily men, who think they are handy enough to take on some sort of home improvement project, only to call in professionals when things get out of hand. Those guys might be well intentioned, but they don’t understand the complexity of what they’re taking on.

When it comes to new process plant construction or upgrade projects launched using in-house resources that get bogged down and fall behind schedule, professionals are often called in to help. In this post, I’ll look at why these issues occur, and then I will follow up with a second post on ways to prevent these project problems.

Process plant construction projects are challenging undertakings . This is true for a simple upgrade in an existing plant, a complex new greenfield production facility, and most everything in between. Process control and automation systems are invariably involved, or they may be the primary item if the project is a control system upgrade. Whether small or large, construction projects have common risks:

  • Cost overruns of capital (CapEx) and operating (OpEx) budgets.
  • Schedule delays make a project drag on, increasing CapEx costs while delaying cash flow expected from new production capabilities.
  • Companies often underestimate the true cost impact of a delayed startup because they consider out-of-pocket costs without factoring in the lost income from production beginning behind schedule.
  • Some improvement projects are ultimately considered failures even after they begin full production because they don’t deliver expected production levels.
Advertisement

Disappointment grows if product quality or quantity never reaches levels necessary to justify the effort and expense.

Any company considering launching an upgrade or new plant has to ask, “Why do so many projects fare so badly?” Here are some common mistakes:

  • Inadequate planning, or more accurately, the wrong kind of planning: Many companies understand the importance of planning, but simply don’t know how to do it.
  • Planning too late in the schedule: Planning can never begin too early, but many companies assign tasks to people with too much to do already, resulting in procrastination with critical steps not happening early enough.
  • Bringing inadequate resources to the project: How many of your people have time to work on an upgrade project?
  • Inexperience: Even the most well-meaning and conscientious people may not be able to help because they have little or no relevant experience.
  • Linear or serial thinking: The timeline for a project
  • Too few people recognize problems developing: An inexperienced person trying to manage construction may not be able to tell when a minor problem threatens to turn into a big one.

With so many critical tasks, which ones need the most attention?

Do the ones with available time have the right skills?

An individual may be very good at running a plant, but those skills won’t necessarily help manage an electrical contractor.

may end up being too long because some planners are convinced only one project task can be worked on at a time.

Knowing which small action taken at a critical time can prevent a disaster is a rare skill and only comes from extensive project management experience.

The unfortunate results of under-performing projects are easy to see: the plant starts up late, costs are too high, the process doesn’t deliver the expected performance, and documentation is inaccurate or incomplete. The new part of the plant will eventually start up and begin production, but it still is often viewed as a failure along with the people who tried to make it happen, unfair as such a judgment might be. In my next post , I will show how to prevent these and other unpleasant project problems.

About the Author

Tim Green is manager of commissioning services at Endress+Hauser and formerly U.S. operations manager for the field services division at MAVERICK Technologies . Previously, he worked at a Fortune 100 automation provider where he had held positions at the North American and global levels.

Tim began working in the electrical field in the U.S. Navy in San Diego, Calif. During his career he has worked as an industrial electrician, instrument technician, PLC programmer, engineering manager, and technical sales professional.

Connect with Tim

LinkedIn

Advertisement

Trending Articles

Advertisement

Related Articles

View all Articles and News
Advertisement
Advertisement