Scroll down to search for more products...
Industry Products
Featured Products
-
Power CAD, Simulation & Digital Twins
Accelerate simulation, CAD, and digital twin workflows with the NVIDIA RTX PRO 6000 Blackwell Workstation Edition. Get powerful AI-enhanced performance, advanced visualization, and enterprise-ready capabilities for demanding projects. -
Precision Motion with Brother Servo Gearboxes
Compact, low-backlash servo gearboxes built to deliver precise motion, high torque density, and reliable automation performance. -
The Next Evolution in Process Control Is Here
DeltaV™ version 16.LTS Distributed Control System (DCS) builds on decades of field-proven innovation to deliver the most robust and reliable release yet. -
Connect Operations, Data, and Insights with GENESIS
Stop struggling with disconnected data. GENESIS unifies SCADA, visualization, historian, and analytics in one platform.
2,033 Products
-
ABB introduces IRB 1100 6-axis robot
Powered by ABB’s OmniCore controller, the IRB 1100 is equipped with motion control capabilities, for supporting rapid assembly, pick and place, and material handling applications. -
TrendMiner introduces ContextHub software solution
ContextHub is a repository, search engine and collaboration platform for context items that can be neatly aligned to assets, processes and events. -
Siemens introduces Optimize MyMachining /Trochoidal application for Sinumerik Edge
Optimize MyMachining /Trochoidal provides users with updates for the existing NC program, optimized machining processes, and sustainability for retrofit applications using dynamic machine data and corresponding data inputs -
Parker announces release of Automation Manager 1.4
While the PAC is Parker’s machine controls solution that combines PLC, HMI, and motion control functionality into a single device, Parker Automation Manager (PAM) is a single integrated development environment (IDE) used to program it. -
Weintek introduces Gateway model cMT-G03/G04
cMT-G03/G04 can independently communicate with the devices, and convert the protocols to MQTT, OPC UA, and SQL...etc, integrating data to IIoT. -
Humatics introduces Spatial Intelligence Platform
The platform comprises radio-frequency beacons deployed in a constellation, mobile sensors, and a software suite. -
Hexagon Manufacturing Intelligence announces 360° FMC-Tracker measurement cell
Supporting a variety of customer applications, the solution offers surface scanning, feature calculation and discrete point measurement. The 360° FMC-Tracker will be available to U.S. customers in the fourth quarter of 2018. -
Energid releases Actin 5 software development kit
The Actin SDK can be used with any type of industrial or collaborative robot or complex articulated mechanism in any type of application, including those in the industrial, medical, Oil & Gas, agricultural, and aerospace domains. -
Beckhoff announces TwinCAT IoT Communicator
The TwinCAT 3 IoT Communicator exchanges data using a publish/subscribe mechanism. Information is exchanged via a message broker that uses the standardized MQTT protocol and acts as a central messaging service in a cloud or local network. -
Antaira releases LNP-0800G-M12-67-24 Layer 2 unmanaged series switch
The switch offers 24 to 55VDC redundant power inputs through 4-pin M12 T-coded male connector. A total power of 180W is available for supplying up to eight IEEE 802.3af (PoE) & 802.3at (PoE+) devices. -
Optomec announces LENS 860 Hybrid Controlled Atmosphere (CA) System
The LENS 860 Hybrid CA system has an 860 x 600 x 610mm work envelope, is equipped with a hermetically-sealed build chamber that maintains oxygen and moisture levels below 10 ppm for processing reactive metals, such as Titanium. -
Sterling Systems & Controls announces Hand Prompt Batching Station
The Hand Prompt Batching Station serves a range of industrial applications where the negative effects of time consuming and problematic manual batching needs to be eliminated. -
Inspekto announces Autonomous Machine Vision QA solution
Plug & Inspect powered systems provide full autonomy to the manufacturing plant: systems immediately self-adapt to any changes in the inspected object environment, such as changes in light conditions and object location or orientation. -
Thermon announces TraceNet Genesis Control & Monitoring System
The TraceNet Genesis System gives access to comprehensive heat trace circuit information, including circuit performance history, fault analysis, and circuit drawings. Using this information, maintenance personnel can predict failures. -
ANCA Motion introduces LinX M-series linear motor
The LinX M-Series is fully compatible with standard pneumatics accessories such as mounting plates, linear guides and couplings. -
FCI introduces FS10i flow switch monitor for machinery manufacturers
The measurement of compressed air flow lines with the FS10i Switch/Monitor can provide information to the equipment’s control system in order to optimize the air flow. -
GAM releases GPL zero-backlash planetary gearboxes
The GPL series is available in seven sizes with ratios from 36:1 to 200:1. Output options for the GPL series include a solid flanged output (GPL-F) and a hollow shaft flanged output (GPL-H). -
CAS Dataloggers announces ProfiSignal Web Software package
Whether for monitoring ongoing testing process, fault analysis, condition or temperature monitoring or energy monitoring, PS Web provides a solution for measurement and testing. -
ATEK Access Technologies announces Datakey Read-Only DFX PC Adapter
The adapter is the latest addition to the DFX RUGGEDrive Series of Secure Digital (SD) memory devices. It works to prevent accidental deletion or modification of recorded data without the need for a read/write switch. -
Hexagon Manufacturing Intelligence announces Optiv Performance 322 coordinate measuring machine
Weighing under 400 lbs, the fixed bridge and moving table-type machine is light enough to be placed directly on existing workbenches and relocated without recalibration by a Hexagon engineer.




