• ISA provides technical resources and standards to help industrial automation professionals advance their careers and the field. We enable automation professionals worldwide to solve problems and enhance their skills by bringing people together to create new technologies and share best practices with future automation professionals.
    • Industry Insights

  • We attract over 140,000 unique automation professionals monthly, making us the premier online content provider and the only dedicated electronic magazine in the automation industry.

    Monthly Magazine

    • More things to read

    Back
    Back
  • M logo for Automation.com Monthly. Link to current issue.

AutoQuiz: How to Calculate Dead Time from Transportation Delay for Thickness Control

By: Joel Don
20 January, 2017
1 min read
AutoQuiz: How to Calculate Dead Time from Transportation Delay for Thickness Control
AutoQuiz: How to Calculate Dead Time from Transportation Delay for Thickness Control
The time it takes the sheet to go from the diebolt actuators to the thickness gauge that transverses the sheet is the transportation delay

AutoQuiz is edited by Joel Don, ISA's social media community manager.

Today's automation industry quiz question comes from the ISA Certified Automation Professional certification program . ISA CAP certification provides a non-biased, third-party, objective assessment and confirmation of an automation professional's skills. The CAP exam is focused on direction, definition, design, development/application, deployment, documentation, and support of systems, software, and equipment used in control systems, manufacturing information systems, systems integration, and operational consulting. Click this link for information about the CAP program. The following question comes from the CAP study guide, Performance Domain V, Deployment.

If the distance in a sheet line from the thickness gauge to the manipulated diebolt actuators is 200 meters and the speed is 4 meters per second, then the dead time from the transportation delay for thickness control is how many seconds?

a) 200 b) 50 c) 5 d) 0.02 e) none of the above

The time it takes the sheet to go from the diebolt actuators, which are the manipulated variable, to the thickness gauge that transverses the sheet to provide the controlled variable (sheet thickness profile across the sheet), is the transportation delay. 50 seconds: Distance / velocity (200 meters / 4 meters per second) is the transportation delay.

The correct answer is B .

Reference

: Greg McMillan, Good Tuning: A Pocket Guide

Advertisement

Trending Articles

Advertisement

Related Articles

View all Articles and News
Advertisement
Advertisement