• ISA provides technical resources and standards to help industrial automation professionals advance their careers and the field. We enable automation professionals worldwide to solve problems and enhance their skills by bringing people together to create new technologies and share best practices with future automation professionals.
    • Industry Insights

  • We attract over 140,000 unique automation professionals monthly, making us the premier online content provider and the only dedicated electronic magazine in the automation industry.

    Monthly Magazine

    • More things to read

    Back
    Back
  • M logo for Automation.com Monthly. Link to current issue.

GE Power announces MXL2 power upgrade solution with Additive Manufactured Performance (AMP)

By: GE Digital
29 June, 2018
GE Power announces MXL2 power upgrade solution with Additive Manufactured Performance (AMP)
GE Power announces MXL2 power upgrade solution with Additive Manufactured Performance (AMP)
The MXL2 with AMP includes two components produced by GE’s Additive Manufacturing Works (AMW) teams in Birr, Switzerland, and Greenville, South Carolina, United States: the first-stage turbine vanes and heat shields.

June 29, 2018 - GE Power announced the MXL2 with Additive Manufactured Performance (AMP)—an upgrade solution for GE’s GT13E2 gas turbines that uses components manufactured using additive technology.

The MXL2 with AMP includes two components produced by GE’s Additive Manufacturing Works (AMW) teams in Birr, Switzerland, and Greenville, South Carolina, United States: the first-stage turbine vanes and heat shields. These parts are among the turbine’s hottest-running components, and the amount of cooling air they traditionally require impacts the engine’s performance. Additive printing allows GE to use advanced cooling designs that reduce the amount of cooling air the parts need.

The MXL2 with AMP upgrade is a direct result of GE’s commitment to additive manufacturing technology. Vattenfall began supporting this technology in 2015 with the installation of four different 3D printed components at its Heizkraftwerk Berlin-Mitte Power Plant near Germany’s capital city of Berlin.

Trending Articles

Advertisement

Related Industry Products

View all Industry Products
Advertisement
Advertisement