• ISA provides technical resources and standards to help industrial automation professionals advance their careers and the field. We enable automation professionals worldwide to solve problems and enhance their skills by bringing people together to create new technologies and share best practices with future automation professionals.
    • Industry Insights

  • We attract over 140,000 unique automation professionals monthly, making us the premier online content provider and the only dedicated electronic magazine in the automation industry.

    Monthly Magazine

    • More things to read

    Back
    Back
  • M logo for Automation.com Monthly. Link to current issue.

Kimberly-Clark Mill Takes First Step In Migration Towards Its Automation Vision of PlantWeb(R) from Emerson

Source: Emerson
11 August, 2003
3 min read

Partial migration of existing DCS moves mill toward using intelligent field to assist best practice maintenance.

AUSTIN, TEXAS (August 11, 2003) -- Emerson Process Management has collaborated with Kimberly-Clark to develop and implement the first step of an efficient migration strategy from the mill's current DCS to PlantWeb(R) digital plant architecture from Emerson. Implementing a changeover to DeltaV(TM) system I/O on tissue machine 1 of three has enabled K-C to move toward implementation of FOUNDATION(TM) fieldbus. This has been achieved without interruption or reduction of production. The other machines will be upgraded next, on the path towards a long-term maintenance practices upgrade.

The goal is to integrate the advanced predictive maintenance enabled by PlantWeb architecture with existing condition-based monitoring of mechanical and electrical equipment.Approximately twenty years ago, the mill at Northfleet, UK, where Andrex bathroom tissues are manufactured, purchased one of the first Rosemount System 3 (RS3(tm)) distributed control systems to be installed in Europe. The system has proved itself to be both powerful and reliable; however K-C knew that the existing architecture would not easily support their vision of utilizing the data from the intelligent field to improve plant performance and reduce maintenance costs.

In addition the system had almost reached its full capacity, restricting the ability to modify the plant or the control strategy.The implementation of a staged change out of the system enabled field instrumentation to be reconnected without disruption to the existing wiring and termination panels. The DeltaV system I/O communicates directly withupgraded RS3 controllers via a virtual I/O driver that mimics the RS3 I/O. A DeltaV ProfessionalPLUS station is used to configure the I/O and the supervising DeltaV controller.Emerson engineers managed the project, provided all the necessary documentation and configured the new software.

The installation was led by K-C engineers, supported by Emerson. In-depth planning beforehand, as well as lots of interaction between the two teams helped to assure a smooth changeover. The change out at site was scheduled to last six days and it was completed within that timescale." There were many benefits to us in adopting this approach," said Steve Thomas, the K-C Project Engineer. "Because we have maintained the existing high level architecture we have minimized the effect on production.

Our operators do not need to be retrained and we were not shut down for extended periods while the I/O hardware was changed out and controllers were upgraded. Installing DeltaV digital automation system components is the first stage in achieving our vision whereby we can utilize the power contained within the intelligent field to change the way we perform maintenance. This will lead to improvements in plant performance as well as reductions in our maintenance costs." Further, the new DeltaV I/O system uses less power than the old and has enhanced redundancy capabilities. The DeltaV I/O system led to a 15% increase in system capacity, and the upgraded controllers led to an additional 50% increase, all within the same cabinet space.

Advertisement

Approaching the project in this way allows the engineering staff to gain experience on the new technologies, through the engineering workstation, without imposing radical changes on other systems users.The next step for K-C is to change the I/O on the other tissue machines and the utilities area. The longer term plan is to migrate the remaining RS3 components over to DeltaV as well as installing AMS predictive maintenance software.

About Emerson Process ManagementEmerson Process Management ( www.emersonprocess.com ), an Emerson business, is a leader in helping businesses automate their production, processing and distribution in the chemical, oil and gas, refining, pulp and paper, power, food and beverage, pharmaceutical and other industries.

The company combines superior products and technology with industry specific engineering, consulting, project management and maintenance services.Emerson brands include PlantWeb(R), Fisher(R), Micro Motion(R), Rosemount(R), DeltaV(TM) and AMS.About EmersonEmerson ( www.gotoemerson.com ) is a global leader in bringing technology and engineering together to provide innovative solutions to customers in process control; electronics and telecommunications; industrial automation; heating, ventilating and air conditioning; and appliance and tools.

Sales in fiscal 2002 were $13.8 billion.