• ISA provides technical resources and standards to help industrial automation professionals advance their careers and the field. We enable automation professionals worldwide to solve problems and enhance their skills by bringing people together to create new technologies and share best practices with future automation professionals.
    • Industry Insights

  • We attract over 140,000 unique automation professionals monthly, making us the premier online content provider and the only dedicated electronic magazine in the automation industry.

    Monthly Magazine

    • More things to read

    Back
    Back
  • M logo for Automation.com Monthly. Link to current issue.

AutoQuiz: How Do You Change from Single Loop Control of a Process Variable?

By: Joel Don
03 June, 2016
1 min read
AutoQuiz: How Do You Change from Single Loop Control of a Process Variable?
AutoQuiz: How Do You Change from Single Loop Control of a Process Variable?
AutoQuiz: Change DCS from single loop control of a process variable to cascade, ratio, feedforward, adaptive, or multi-variable control

AutoQuiz is edited by Joel Don, ISA's community manager.

Today's automation industry quiz question comes from the ISA Certified Control Systems Technician (CCST) program . Certified Control System Technicians calibrate, document, troubleshoot, and repair/replace instrumentation for systems that measure and control level, temperature, pressure, flow, and other process variables. Click this link for information about the CCST program. This question is from the Level III study guide, Domain 2, Loop checking. Level III represents a professional who has a 13-year total of education, training, and/or experience.

single-loop-control-process-variable

With a DCS it is possible to change from single loop control of a process variable to cascade, ratio, feedforward, adaptive, or multi-variable control, by ___________ if all of the peripheral hardware is installed in the field and connected to the DCS terminal board.

a) relocating the transmitters and FCE b) reconfiguring the loop c) installing a UPS and inverter d) installing another CPU e) none of the above

In that all the peripherals and hardware are present and in order, the task of changing control strategies and algorithms and how the gathered data from the process undergoes manipulation by the distributed control system.

In ratio control, the DCS maintains a predetermined ratio between two variables. In cascade control, one controller output is the input for another controller. Feedforward input comes from some possible disturbance that then converts to corrective action to the process. Feedforward takes place outside the feedback loop. Adaptive and multivariable control strategies also leverage numbers per their own dispositions.

These control strategies use process data, process numbers, and manipulate those inputs mathematically. How that data parses depends on the configuration of the loop. The DCS doesn't care; it can do the arithmetic for all these control strategies.

The best answer is B .

Advertisement

Trending Articles

Advertisement

Related Articles

View all Articles and News
Advertisement
Advertisement