• ISA provides technical resources and standards to help industrial automation professionals advance their careers and the field. We enable automation professionals worldwide to solve problems and enhance their skills by bringing people together to create new technologies and share best practices with future automation professionals.
    • Industry Insights

  • We attract over 140,000 unique automation professionals monthly, making us the premier online content provider and the only dedicated electronic magazine in the automation industry.

    Monthly Magazine

    Back
    Back
  • M logo for Automation.com Monthly. Link to current issue.

Articles and News

Current Filters Clear

  • Control Systems

Refine Results

Content Type

Topics

  • Digital Transformation
  • Industrial Automation and Control
  • Industrial Data and Connectivity
  • Industrial Safety
  • Industrial Security
  • Operations Management

Industry

2,798 Results Found
  • PLCopen cooperates with CAN in Automation

    The idea is to be able to link variables in different engineering systems via a top level architecture in a very easy way.
    01 May, 2012 | 1 minute
  • PLCopen updates Safety Specification

    Part 3 – Extensions to the Function Blocks extend the scope of the safety specification, and harmonize the diagnostics interface for easier handling by the user.
    01 May, 2012 | 1 minute
  • Opto 22 Announces Android App for Automation and Control

    Opto aPAC app monitors and manages a SNAP PAC System using mobile devices running the Android operating system.
    01 May, 2012 | 2 minutes
  • Is a VFD or Valve Faster?

    Is a VFD or Valve Faster?
    By: Gregory K. McMillan
    27 April, 2012 | 2 minutes
  • It’s a process, not a product

    Automation.com, April 2012 By John Krasnokutsky, Siemens Industry Machine builders and automation engineers should note that an energy-efficient system can actually translate into higher productivity.
    22 April, 2012 | 4 minutes
  • What Are the Factors that Affect VFD Rangeability?

    What Are the Factors that Affect VFD Rangeability?

    What are the factors that affect VFD rangeability?
    By: Gregory K. McMillan
    20 April, 2012 | 2 minutes
  • Global NC Market Grew 14.4% in 2011

    CIMdata estimates that end-user payments for NC software grew from $1.333 billion in 2010 to $1.525 billion in 2011.
    18 April, 2012 | 2 minutes
  • DCS Migration & Retrofit Insights

    Automation.com, April 2012 By Bill Lydon, Editor There is a great deal of discussion about DCS migrations and retrofits these days, raising questions that can be overwhelming for users. Suppliers offer upgrades from their legacy systems as well as upgrades from a competitor’s DCS. I interviewed industry veteran, Paul Galeski, to get his insights on this important topic.
    17 April, 2012 | 6 minutes
  • How to Create a P&ID

    How to Create a P&ID

    P&IDs should generally follow ISA symbols for the basic instruments. If you follow that symbology, most anyone can read and understand the P&IDs quickly.
    By: Gregory K. McMillan
    14 April, 2012 | 5 minutes
  • Manufacturing Technology Orders Continue to Rise in 2012

    February U.S. manufacturing technology orders totaled $444.06 million according to AMT, up 9.3% from January and up 35.2% from February 2011.
    10 April, 2012 | 1 minutes
  • Opto 22 PAC goes to the bottom of the Mariana Trench

    SNAP PAC acts as a central controller that manages more than 180 interconnected onboard systems aboard director James Cameron's Deepsea Challenger submersible.
    05 April, 2012 | 2 minutes
  • Innovation & Radical Thinking Simplify Gear Machining

    Automation.com, April 2012 By Bill Lydon, Editor Sandvik Coromant, DMG / Mori Seiki USA, and Siemens PLC collaborated to replace multiple machines and cutting tools with intelligent design of a new method to accomplish gear hobbing using one machine and one cutting tool.
    02 April, 2012 | 3 minutes
  • 2012 AIChE Spring Meeting & 8th Global Congress on Process Safety

    2012 AIChE Spring Meeting & 8th Global Congress on Process Safety

    2012 AIChE Spring Meeting & 8th Global Congress on Process Safety
    By: Juliann Grant
    31 March, 2012 | 3 minutes
  • How to Select a System Integrator for an Industrial Automation Project

    Look for an industrial systems integrator that can add value…not one that just does what you tell them. A good integrator will ask lots of questions so they fully understand your process.
    By: Gregory K. McMillan
    30 March, 2012 | 5 minutes
  • Sercos publishes Sercos III Specification Update V1.3

    V1.3 specification broadens the functionality and the range of applications of the international Sercos real-time standard, while considering new trends in machine and plant construction.
    28 March, 2012 | 2 minutes
  • Bosch Rexroth introduces IndraMotion MTX micro Trainer software

    The training software offers realistic operation and programming capabilities for milling, turning and drilling sequences, independent of any machine tool hardware.
    28 March, 2012 | 2 minutes
  • Resolvers, Optical Encoders and Inductive Encoders

    Automation.com, March 2012 By Mark Howard, Zettlex Resolvers are good. Encoders are good. But which is the best? This article examines the strengths and weaknesses of each and offers some alternatives.
    27 March, 2012 | 4 minutes
  • BASF Benefits from Fast Implementation and Reduced Maintenance Costs

    Automation.com, March 2012 By Rockwell Automation Rockwell installed three ControlLogix PACs, FactoryTalk, and a 100Mbit network with two Stratix 8000 switches to replace five old PLCs and ControlNet at a BASF shipping facility in Germany.
    25 March, 2012 | 6 minutes
  • Nanotec Electronic opens US subsidiary

    Nanotec Electronic US will offer Nanotec’s Plug and Drive Servo stepper motors, BLDC motors, stepper driven linear actuators and intelligent motor controllers.
    23 March, 2012 | 2 minutes
  • Rockwell Automation controls Kingston wastewater treatment plant

    PACs and MCCs from Rockwell Automation helped standardize plant-wide control and contributed to UK completing the project under budget and six months ahead of schedule.
    20 March, 2012 | 8 minutes
Advertisement
Advertisement