Scroll down to search for more products...
Industry Products
Featured Products
-
Multi-Turn Sensor: Easy-to-Integrate Analog Output
Now available: New MZ1 Multi-Turn Rotary Angle Sensor with a straightforward analog output option, Counts to 44-turns in a compact 22 mm package -
Reliable Ethernet for Harsh Environments
Rugged DataTuff® cables deliver reliable connectivity through abrasion, chemicals, moisture and temperature extremes. -
Simplify Automation Across Your Operation
Need to automate without adding unnecessary complexity? ARIA offers a configurable robot cell for a variety of applications. -
One License. Unlimited Tags, Clients & Devices.
Lost in licensing math? Ignition has no per-client & per-tag costs. No device cap. No logging out for others to log in. Just one flat rate. -
SICK sensingCam SEC200 for Inspection & Tracking
Capture image-based inspection and identification in one device. The SICK sensingCam SEC200 combines barcode reading, optical character verification, feature inspection, and flexible setup to improve traceability and quality control across production and logistics.
716 Products
-
Hexagon Manufacturing Intelligence introduces PC-DMIS 2017 R2 measurement software
This is the second of two releases scheduled for PC-DMIS in 2017. PC-DMIS 2017 R2 introduces Slideshow for INSPECT software, allowing users to create customizable layouts with inspection results populated during measurement. -
Microchip Technology introduces CL88020 LED driver
The CL88020, an extension of Microchip’s CL88XX family, is designed to drive a long string of LEDs directly from the 120 VAC line input. The product allows customers to create LED lighting applications. -
Student Edition of the »RealTime Suite« announced
Kithara Software has announced the “Student Edition” of the »RealTime Suite«, which will be available for universities and colleges for the coming winter semester of 2017. Including the complete functional range of the software library, this version allows for an easy introduction to the programming of real-time functions. -
Fujitsu Components announces BlueBrain development platform with breakout board and interface board
The embedded hardware, software, and industry-standard interfaces and peripherals are designed to reduce the time and expertise needed to develop and deploy wireless, sensor-based products running simple or complicated algorithms. -
Opto 22 announces groov 3.4 update
With this version of groov, operators can trend more data over a longer period: up to 5 years. groov’s built in trend gadget now offers an interactive type of trend that handles many more data points. -
Yaskawa Motoman introduces MPX3500 six-axis robot
The MPX3500 has a 15 kg wrist payload capacity and a 25 kg upper arm payload capacity, enabling spray equipment to be mounted directly on the robot arm. It also features a 2,700 mm horizontal reach and ±0.15 mm repeatability. -
NI introduces LabVIEW NXG 1.0 system design software
The 1.0 release of LabVIEW NXG is intended to help engineers performing benchtop measurements increase their productivity with nonprogramming workflows to acquire and iteratively analyze measurement data. -
Microchip introduces PIC32MK family of microcontrollers
The PIC32MK MC devices combine 32-bit processing with advanced analog peripherals such as a quad 10 MHz op amp, comparators and motor-control optimized Pulse Width Modulation (PWM) modules. -
ams introduces AS7261 JENCOLOR XYZ color point sensor
The AS7261 JENCOLOR XYZ sensor is a complete platform for color sensing, intended to ease design-in and simplify production processes for manufacturers of professional or consumer colorimeters and color analysers. -
EPLAN announces launch of EPLAN Cogineer
EPLAN Cogineer is fully integrated into the EPLAN Platform shared by EPLAN Electric P8 and other EPLAN software products. This allows users to create project data in EPLAN Electric P8, and then generate the schematics using that data in EPLAN Cogineer without any duplication of effort. -
Abaco Systems announces ImageFlex vision software
Typical applications for ImageFlex include Degraded Visual Environment (DVE), 360° situational awareness, helmet mounted sight processing, and target identification and tracking. -
Honeywell introduces Matrikon FLEX OPC UA developer tookit
Intended for use by discrete and process industry manufacturers, commercial customers, and automation original equipment manufacturers (OEMs), Matrikon FLEX is a developer toolkit that enables any application, regardless of size, with OPC UA. -
Schneider Electric releases System Platform 2017
This next generation offering includes an interface with improved visualization, smarter navigation and is integrated with the Schneider Electric Industrial Software portfolio –extending new and existing solutions with capabilities that digitally link the Engineering, Operations and Asset Performance aspects of the industrial value chain. -
e-con Systems announces See3CAM_81 USB 3.0 camera
See3CAM_81 is a solution for customers designing kiosk, multimedia applications, high resolution OCR, barcode scanning applications and medical and scientific applications such as tissue vision, pathology examination and microscopic applications. -
Inductive Automation releases Ignition Edge product line
Ignition Edge by Inductive Automation is a line of Ignition products to be embedded into field and OEM devices at the edge of the network. Ignition is designed to work on central servers and deploy to multiple clients, while Ignition Edge products can be installed on devices at the edge of the network. -
ULVAC introduces NA-1500 dry etching system for 600mm advanced packaging substrates
While there are many 200mm/300mm wafer dry etching systems in the market today, there was no dry etching system for 600mm substrate, providing for a uniform Descum process and Ti etching process. -
IDS introduces Ensenso X 3D camera system
The system comprises a 100W projector unit with an integrated GigE switch on which two 1.3 megapixel cameras can be mounted at different distances. -
Ubertesters announces release of Ubertesters 2.0 QA management platform
Ubertesters 2.0 offers mobile organizations a platform to manage their entire mobile QA process and teams. -
Microchip introduces motorBench Development Suite for MPLAB X development environment
The plug-in, called motorBench Development Suite, is a Graphical User Interface (GUI)-based tool with automatic tuning of feedback control gains and offline accurate measurement of critical motor parameters such as resistance, inductances and the back electromagnetic force (EMF) constant. -
FANUC America introduces FANUC Machining Simulator with Fusion 360 software
The FANUC Machining Simulator comes with Fusion 360, a cloud-based 3D CAD, CAM and CAE software platform that helps bridge the gap between design and machining and works on both Mac and PC.


